Prefab panels factory

From Workers & Resources: Soviet Republic Official Wiki

Prefab panels are a construction resources usable for construction and to exportation in Workers & Resources: Soviet Republic.

Background

A prefab panels factory is a manufacturing facility specialized in producing prefabricated building panels. These panels are pre-engineered and fabricated off-site, then transported to construction sites for assembly. Typically made from materials like steel, concrete, or wood, prefab panels offer numerous advantages, including faster construction times, reduced labor costs, and improved quality control. These factories often employ advanced technology and automated processes to streamline production. Prefab panels find applications in various construction projects, from residential homes to commercial buildings, offering sustainable and cost-effective solutions for modern construction challenges.

Gameplay

The player provides cement and gravel to the prefab panels factory via delivery by road or by storing gravel and cement in an appropriate storage. The prefab panels factory turns gravel and cement into prefab panels. Prefab panels can be stored in an open storage or picked up by an open-hull road vehicle.

Prefab panels are used for construction and can be exported via a customs house.

Depending on the Game settings the player needs to take care of provisioning water for workers and taking care of wastewater and/or maintenance.

Production

Prefab panels are produced from cement and gravelat a rate of 9.8 t cement and 65 t gravel for 71 t prefab panels, which is the maximum daily production per prefab panels factory.

Storage

Prefab panels may be stored in both small and medium open storage buildings.

Transportation

They can be transported by using open-hull trucks, trains using open-hull cargo wagons, or by forklifts.

Uses

Main article: Prefab panels

Prefab panels is a resource mainly used for construction. It can be sold too for a low price.

Notes

Construction

RequirementsGroundworks
Workdays 3236 Workdays
Concrete 33 t Concrete
Gravel 25 t Gravel
Asphalt 20 t Asphalt
Steel 55 t Steel
Bricks 158 t Bricks
Boards 52 t Boards
Building
Concrete 33 t Concrete
Gravel 25 t Gravel
Asphalt 20 t Asphalt
Mechanisms: Excavator
(max. 5)
Needs workers No
(max. 323)