Gravel processing plant

From Workers & Resources: Soviet Republic Official Wiki

Background

A Gravel processing plant typically requires a combination of equipment and machinery to process raw materials into finished products that meet specific quality and size requirements. The exact equipment and machinery needed may vary depending on the specific operation and the type of sand and gravel being processed, usually:

  • A primary crusher: This machine is used to break down large rocks into smaller pieces that can be processed more easily.
  • Vibrating feeders: These devices are used to transport raw materials from the primary crusher to other processing equipment.
  • Scalping screens: These screens remove large particles that are not needed in the final product.
  • Gravel washing and classification equipment: These machines are used to wash, separate, and classify the sand and gravel by size and shape.

Gameplay

The player places a Gravel processing plant for the production of gravel anywhere on the map on equalized, solid ground. To produce gravel the player needs to deliver quarried stone to the Gravel processing plant and workers need to be available in the plant.

Production

The large Gravel processing plant can have a maximum daily production of 82t of gravel per workday, while the small Gravel processing plant has a maximum daily production of 27t of gravel per workday.

Storage

Gravel can be stored in aggregate storages.

Transportation

Gravel can be transported in dump trucks, train hopper cars and via conveyor belts.

Uses

Main article: Gravel

Gravel is a aggregate that has many applications. It can used in the creation of other resources such as asphalt, cement, concrete, prefab panels and chemicals. It can be used in almost all constructions during the groundworks phase. It can be sold too for a moderate price.

Construction

Gravel processing plant
RequirementsGroundworks
Workdays 1197 Workdays
Concrete 109t Concrete
Gravel 12t Gravel
Asphalt 10t Asphalt
Steel 44t Steel
Building
Gravel 12t Gravel
Asphalt 10t Asphalt
Mechanisms: Excavators
(max. 3)
Needs workers No
(max. 119)
Small gravel processing plant
RequirementsGroundworks
Concrete 2.8t Concrete
Gravel 2.1t Gravel
Asphalt 1.7t Asphalt
Steel 12t Steel
Building
Concrete 2.8t Concrete
Gravel 2.1t Gravel
Asphalt 1.7t Asphalt
Mechanisms: Excavators
(max. 3)
Needs workers No
(max. 50)