Aggregate Storage

From Workers & Resources: Soviet Republic Official Wiki

Aggregate storages are storages for storing raw materials/aggregates useful for the production of semi-finished products in Workers and Resources: Soviet Republic.

Background

Aggregate storage for raw materials/aggregates in industrial contexts involves consolidating bulk quantities of aggregates for efficient handling and processing. These storage facilities, often located near production sites, optimize logistics by reducing transportation costs and ensuring a steady supply of materials. Raw material aggregate storage helps streamline inventory management, minimize stockouts, and support just-in-time manufacturing processes.

Gameplay

Aggregate storages are placed by the player near mines and production sites. Each Aggregate storage can only store one kind of aggregate which has to be assigned by the player. Aggregates can be delivered to the aggregate storage by using dump trucks or by using conveyor belts.

Aggregates

Stored in aggregate storage.

Transportation

Aggregates can be transported in dump trucks, train hopper cars and via conveyor belts.

Buildings related to aggregate storages

Storages

Name Cost Lifespan Energy Wattage Storage capacity Structure Notes
Tool storage rumble small.png
Small Aggregate storage
Workdays 347 Workdays, Concrete 8.8 Concrete,
Gravel 6.8 Gravel, Asphalt 5.4 Asphalt
Steel 19 Steel, Mechanical components 0.34 Mechanical components
30 3.0 MWh 50 kW All aggregates 870t
Metal scrap 522 Metal scrap
Aluminium scrap 609 Aluminium scrap
Access 1x road access
3x Conveyor connection
L/U 2
Tool storage rumble big.png
Large Aggregate storage
Workdays 675 Workdays, Concrete 16 Concrete,
Gravel 13 Gravel, Asphalt 10 Asphalt
Steel 34 Steel, Mechanical components 1.0 Mechanical components
30 3.0 MWh 50 kW All aggregates 1950t
Metal scrap 1170 Metal scrap
Aluminium scrap 1365 Aluminium scrap
Access 1x road access
8x Conveyor connection
L/U 2
Tool muddy gravelstorage.png
Aggregate storage (Free)
Free All aggregates 180t
Metal scrap 108 Metal scrap
Aluminium scrap 126 Aluminium scrap
Access 1x road access
L/U 1
AggregateStorage1.png
Aggregate storage
Workdays 442 Workdays, Concrete 61 Concrete,
Gravel 6.9 Gravel, Asphalt 5.5 Asphalt
Steel 15 Steel, Mechanical components 2.5 Mechanical components
30 3.0 MWh 50 kW All aggregates 1000t
Metal scrap 600 Metal scrap
Aluminium scrap 700 Aluminium scrap
Access 1x road access
12x Conveyor connection
L/U 2
AggregateStorage2.png
Aggregate storage
Workdays 786 Workdays, Concrete 104 Concrete,
Gravel 12 Gravel, Asphalt 9.9 Asphalt
Steel 27 Steel, Mechanical components 1.5 Mechanical components
30 3.0 MWh 50 kW All aggregates 2000t
Metal scrap 1200 Metal scrap
Aluminium scrap 1400 Aluminium scrap
Access 1x road access
16x Conveyor connection
L/U 2
AggregateStorage3.png
Aggregate storage
Workdays 1113 Workdays, Concrete 133 Concrete,
Gravel 29 Gravel, Asphalt 23 Asphalt
Steel 29 Steel, Mechanical components 1.7 Mechanical components
30 3.0 MWh 50 kW All aggregates 2500t
Metal scrap 1500 Metal scrap
Aluminium scrap 1750 Aluminium scrap
Access 1x road access
16x Conveyor connection
L/U 2
AggregateStorage4.png
Aggregate storage
Workdays 1996 Workdays, Concrete 239 Concrete,
Gravel 47 Gravel, Asphalt 38 Asphalt
Steel 57 Steel, Mechanical components 3.5 Mechanical components
30 3.0 MWh 50 kW All aggregates 5000t
Metal scrap 3000 Metal scrap
Aluminium scrap 3500 Aluminium scrap
Access 1x road access
20x Conveyor connection
L/U 2

Conveyor belts

Name Cost Lifespan Energy Wattage Structure Notes
Tool conveyor.png
Build conveyor connection
Workdays Workdays, Steel Steel, Mechanical components Mechanical components
Usage depends on length.
Access 1x road access
3x Conveyor connection
L/U
Tool conveyor enging.png
Conveyor engine/transfer
Workdays Workdays, Concrete Concrete,
Gravel Gravel, Asphalt Asphalt
Steel Steel, Mechanical components Mechanical components
Usage depends on height.
28 6.0 MWh 99 kW Access 1x road access
4x Conveyor connection
L/U
Tool conveyor engine 3in e.png
Conveyor engine/transfer
Workdays Workdays, Concrete Concrete,
Gravel Gravel, Asphalt Asphalt
Steel Steel, Mechanical components Mechanical components
Usage depends on height.
28 6.0 MWh 99 kW Access 1x road access
4x Conveyor connection
L/U
Tool conveyor engine overpasse.png
Conveyor overpass
Workdays 431 Workdays, Concrete 8.6 Concrete,
Gravel 6.6 Gravel, Asphalt 5.3 Asphalt
Steel 11 Steel, Mechanical components 2.4 Mechanical components
28 6.0 MWh 99 kW Access 2x road access
2x Conveyor connection
L/U
Tool conveyor engine overpassf.png
Conveyor overpass
Workdays 509 Workdays, Concrete 10 Concrete,
Gravel 8.2 Gravel, Asphalt 6.6 Asphalt
Steel 13 Steel, Mechanical components 2.8 Mechanical components
28 6.0 MWh 99 kW Access 2x road access
4x Conveyor connection
L/U
Tool conveyor engine overpassg.png
Conveyor overpass
Workdays 509 Workdays, Concrete 10 Concrete,
Gravel 8.2 Gravel, Asphalt 6.6 Asphalt
Steel 13 Steel, Mechanical components 2.8 Mechanical components
28 6.0 MWh 99 kW Access 2x road access
4x Conveyor connection
L/U

Aggregate loading

Name Cost Lifespan Energy Wattage Length Structure Notes
Tool road cargo rumble loading.png
Truck aggregate loading
Workdays 94 Workdays, Concrete 1.5 Concrete,
Gravel 1.1 Gravel, Asphalt 0.92 Asphalt
Steel 6.2 Steel, Mechanical components 0.074 Mechanical components
28 23 MWh 385 kW Access 1x road access
2x Conveyor connection
L/U 2
Tool rail station rumble loading.png
Train aggregate loading
Workdays 2343 Workdays, Concrete 258 Concrete,
Gravel 39 Gravel, Asphalt 31 Asphalt
Steel 75 Steel, Mechanical components 5.9 Mechanical components
28 74 MWh 1240 kW 100 m Access 1x road access
3x Conveyor connection
L/U 2
AggregateLoading1.png
Train aggregate loading
Workdays 1143 Workdays, Concrete 124 Concrete,
Gravel 13 Gravel, Asphalt 10 Asphalt
Steel 40 Steel, Mechanical components 3.3 Mechanical components
28 38 MWh 645 kW 32 m Access 1x road access
5x Conveyor connection
L/U
AggregateLoading2.png
Train aggregate loading
Workdays 2824 Workdays, Concrete 310 Concrete,
Gravel 36 Gravel, Asphalt 29 Asphalt
Steel 97 Steel, Mechanical components 7.9 Mechanical components
28 211 MWh 3.5 MW 123 m Access 1x road access
9x Conveyor connection
L/U
AggregateLoading3.png
Train aggregate loading
Workdays 3297 Workdays, Concrete 351 Concrete,
Gravel 44 Gravel, Asphalt 35 Asphalt
Steel 112 Steel, Mechanical components 9.5 Mechanical components
28 211 MWh 3.5 MW 123 m Access 1x road access
9x Conveyor connection
L/U
Tool harbor gravel loading.png
Harbor for aggregate loading
Workdays 4278 Workdays, Concrete 456 Concrete,
Gravel 95 Gravel, Asphalt 76 Asphalt
Steel 122 Steel, Mechanical components 9.8 Mechanical components
30 208 MWh 3.48 MW 242 m Access 1x road access
3x Conveyor connection
2x Pipeline connection
Station for 2 ships avaialable.
L/U 3
Cableway aggregate loading (small)-toolbar.png
Cableway aggregate loading (small)
Workdays 276 Workdays, Concrete 4.8 Concrete,
Gravel 3.7 Gravel, Steel 16 Steel
Mechanical components 0.27 Mechanical components, Electro components 0.11 Electro components
18 27 MWh 465 kW Access 1x road access
1x Conveyor connection
L/U
Cableway aggregate loading (big)-toolbar.png
Cableway aggregate loading (big)
Workdays 421 Workdays, Concrete 7.7 Concrete,
Gravel 5.9 Gravel, Steel 24 Steel
Mechanical components 0.44 Mechanical components, Electro components 0.22 Electro components
18 41 MWh 697 kW Access 1x road access
2x Conveyor connection
L/U

Aggregate unloading

Name Cost Lifespan Energy Wattage Length Structure Notes
Tool road cargo rumble unloading.png
Truck aggregate unloading
Workdays 82 Workdays, Concrete 1.7 Concrete,
Gravel 1.3 Gravel, Asphalt 1.1 Asphalt
Steel 4.9 Steel, Mechanical components 0.062 Mechanical components
28 6.0 MWh 99 kW Access 1x road access
2x Conveyor connection
L/U 2
Tool rail station rumble unloading.png
Train aggregate unloading
Workdays 1435 Workdays, Concrete 61 Concrete,
Gravel 47 Gravel, Asphalt 37 Asphalt
Steel 60 Steel, Mechanical components 0.51 Mechanical components
28 29 MWh 499 kW 149 m Access 1x road access
4x Conveyor connection
L/U 2
AggregateUnloading1.png
Train aggregate unloading
Workdays 396 Workdays, Concrete 12 Concrete,
Gravel 9.5 Gravel, Asphalt 7.6 Asphalt
Steel 20 Steel, Mechanical components 0.30 Mechanical components
28 3.0 MWh 50 kW 3 m Access 1x road access
3x Conveyor connection
L/U
AggregateUnloading2.png
Train aggregate unloading
Workdays 1649 Workdays, Concrete 78 Concrete,
Gravel 60 Gravel, Asphalt 48 Asphalt
Steel 60 Steel, Mechanical components 0.78 Mechanical components
28 14 MWh 249 kW 130 m Access 1x road access
8x Conveyor connection
L/U
AggregateUnloading3.png
Train aggregate unloading
Workdays 2802 Workdays, Concrete 142 Concrete,
Gravel 109 Gravel, Asphalt 87 Asphalt
Steel 93 Steel, Mechanical components 1.3 Mechanical components
28 27 MWh 450 kW 130 m Access 1x road access
16x Conveyor connection
L/U
Tool harbor gravel unloading.png
Harbor for aggregate unloading
Workdays 3896 Workdays, Concrete 456 Concrete,
Gravel 95 Gravel, Asphalt 76 Asphalt
Steel 109 Steel, Mechanical components 7.0 Mechanical components
30 88 MWh 1473 kW 242 m Access 1x road access
2x Conveyor connection
2x Pipeline connection
Station for 2 ships avaialable.
L/U 3
Cableway aggregate unloading (small)-toolbar.png
Cableway aggregate unloading (small)
Workdays 377 Workdays, Concrete 6.4 Concrete,
Gravel 4.9 Gravel, Steel 21 Steel
Mechanical components 0.49 Mechanical components, Electro components 0.20 Electro components
18 19 MWh 322 kW Access 1x road access
1x Conveyor connection
L/U
Cableway aggregate unloading (big)-toolbar.png
Cableway aggregate unloading (big)
Workdays 807 Workdays, Concrete 19 Concrete,
Gravel 15 Gravel, Steel 44 Steel
Mechanical components 0.67 Mechanical components, Electro components 0.34 Electro components
18 33 MWh 555 kW Access 1x road access
2x Conveyor connection
L/U