Liquid storage tank

From Workers & Resources: Soviet Republic Official Wiki
Revision as of 10:14, 21 February 2024 by workers-resources-fandom>Mrd.escher (Created page with "'''Liquid storage tanks''' are storages for storing liquid raw and intermediate resources for the production of products in ''Workers and Resources: Soviet Republic''. ==Background== Liquid storage tanks are containers designed to hold various types of liquids, ranging from water and oil to chemicals and liquefied gases. Typically made from steel, fiberglass, or concrete, these tanks vary in size and shape to accommodate different needs, from small residential water...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Liquid storage tanks are storages for storing liquid raw and intermediate resources for the production of products in Workers and Resources: Soviet Republic.

Background

Liquid storage tanks are containers designed to hold various types of liquids, ranging from water and oil to chemicals and liquefied gases. Typically made from steel, fiberglass, or concrete, these tanks vary in size and shape to accommodate different needs, from small residential water tanks to large industrial facilities. They play a crucial role in industries such as agriculture, manufacturing, and petroleum, providing safe storage and transportation for liquids. Tank designs often include features like insulation, corrosion resistance, and safety mechanisms to ensure the integrity of the stored liquids and prevent environmental hazards.

Gameplay

Liquid storage tanks are placed by the player near production sites. A Liquid storage tank can store only one kind of liquid resources. Liquid resources can't be delivered straight to the liquid storage tank but an additional pumping station is required. Liquid resources can be transported by using Tank trucks or by using #Pipelines with help of Pumping stations.

Liquid storage tank resources

Resources stored in liquid storage tanks.

Transportation

Liquid resources can be transported in Tank trucks, Railway tankers and with pipelines.

Buildings related to liquid storages

Storages

Name Cost Lifespan Energy Wattage Storage capacity Structure Notes
Tool oil storage.png
Oil/fuel storage
Workdays 683 Workdays, Concrete 31t Concrete,
Gravel 23t Gravel, Asphalt 19t Asphalt
Steel 11t Steel, Mechanical components 2.4t Mechanical components
30 3.0 MWh 50 kW Oil 1500t Oil
Bitumen 1500t Bitumen
Fuel 1500t Fuel
Liquid fertiliser 1500t Liquid fertiliser
Access 1x road access
4x Pipeline connection
L/U 1
Tool oil storage2.png
Oil/fuel storage
Workdays 53 Workdays, Concrete 1.5t Concrete,
Gravel 1.2t Gravel, Asphalt 0.95t Asphalt
Steel 1.2t Steel, Mechanical components 0.25t Mechanical components
30 3.0 MWh 50 kW Oil 90t Oil
Bitumen 90t Bitumen
Fuel 90t Fuel
Liquid fertiliser 90t Liquid fertiliser
Access 1x road access
3x Pipeline connection
L/U 2
Tool oil storage3.png
Oil/fuel storage
Workdays 186 Workdays, Concrete 6.6t Concrete,
Gravel 5.1t Gravel, Asphalt 4.1t Asphalt
Steel 3.8t Steel, Mechanical components 0.79t Mechanical components
30 3.0 MWh 50 kW Oil 300t Oil
Bitumen 300t Bitumen
Fuel 300t Fuel
Liquid fertiliser 300t Liquid fertiliser
Access 1x road access
6x Pipeline connection
L/U 1

Pipeline connection

Name Cost Lifespan Energy Wattage Structure Notes
Tool pipe.png
Pipe connection
Workdays Workdays, Steel Steel,

Mechanical components Mechanical components,

Usage depends on length.

Access 1x road access
2x pipe connection
L/U None
Tool pipe underground.png
Underground pipe connection
Workdays Workdays, Concrete Concrete,

Gravel Gravel, Steel Steel,
Mechanical components Mechanical components, Boards Boards
Usage depends on length.

Access 1x road access
2x pipe connection
L/U None
Tool pipe pumping station underground2.png
Foreign pipeline connection[1]
Workdays 2183 Workdays, Concrete 21t Concrete,

Gravel 16t Gravel, Asphalt 13t Asphalt,
Steel 38t Steel, Mechanical components 14t Mechanical components

28 Access 1x road access
2x pipe connection
Can only be build on the border
L/U None

Pumping stations

Name Cost Lifespan Energy Wattage Structure Notes
Tool pipe pumping station.png
Pipe pumping station
Workdays 373 Workdays, Concrete 7.7t Concrete,

Gravel 5.9t Gravel, Asphalt 4.7t Asphalt,
Steel 10t Steel, Mechanical components 2.1t Mechanical components

28 9.0 MWh 149 kW Access 1x road access
1x pipe connection(import)
3x pipe connection(export)
L/U None
Tool pipe pumping station2.png
Pipe pumping station
Workdays 373 Workdays, Concrete 7.7t Concrete,

Gravel 5.9t Gravel, Asphalt 4.7t Asphalt,
Steel 10t Steel, Mechanical components 2.1t Mechanical components

28 9.0 MWh 149 kW Access 1x road access
3x pipe connection(import)
1x pipe connection(export)
L/U None
Tool pipe pumping station underground.png
Underground pumping station
Workdays 553 Workdays, Concrete 17t Concrete,

Gravel 13t Gravel, Asphalt 10t Asphalt,
Steel 12t Steel, Mechanical components 2.6t Mechanical components

28 9.0 MWh 149 kW Access 1x road access
1x pipe connection(import)
3x pipe connection(export)
L/U None
Tool pipe pumping station underground2.png
Underground pumping station
Workdays 553 Workdays, Concrete 17t Concrete,

Gravel 13t Gravel, Asphalt 10t Asphalt,
Steel 12t Steel, Mechanical components 2.6t Mechanical components

28 9.0 MWh 149 kW Access 1x road access
3x pipe connection(import)
1x pipe connection(export)
L/U None

Liquid storage loading/unloading

Name Cost Lifespan Energy Wattage Length Structure Notes
Tool road pumping station.png
Oil/fuel loading & unloading
Workdays 355 Workdays, Concrete 9.4t Concrete,
Gravel 7.2t Gravel, Asphalt 5.8t Asphalt
Steel 8.7t Steel, Mechanical components 1.8t Mechanical components
28 14 MWh 249 kW Access 1x road access
2x Pipeline connection
L/U 2
Tool road pumping station v2.png
Oil/fuel loading & unloading
Workdays 355 Workdays, Concrete 9.4t Concrete,
Gravel 7.2t Gravel, Asphalt 5.8t Asphalt
Steel 8.7t Steel, Mechanical components 1.8t Mechanical components
28 14 MWh 249 kW Access 2x road access
2x Pipeline connection
L/U 6
Tool rail pumping station.png
Oil/fuel loading & unloading
Workdays 791 Workdays, Concrete 20t Concrete,
Gravel 16t Gravel, Asphalt 12t Asphalt
Steel 19t Steel, Mechanical components 4.0t Mechanical components
28 14 MWh 249 kW 49 m Access 2x road access
4x Pipeline connection
4x Railway connection
L/U 2
Liquid train small.png
Oil/fuel loading & unloading[2]
Workdays 791 Workdays, Concrete 20t Concrete,
Gravel 16t Gravel, Asphalt 12t Asphalt
Steel 19t Steel, Mechanical components 4.0t Mechanical components
28 14 MWh 249 kW 119 m Access 2x road access
4x Factory connection
4x Railway connection
L/U
Liquid train big.png
Oil/fuel loading & unloading[2]
Workdays 273 Workdays, Concrete 24t Concrete,
Gravel 6.3t Gravel, Asphalt 5.0t Asphalt
Steel 12t Steel
28 14 MWh 249 kW 39 m Access 1x road access
4x Pipeline connection
2x Railway connection
L/U
Tool harbor pumping.png
Pumping harbor
Workdays 3547 Workdays, Concrete 456t Concrete,
Gravel 95t Gravel, Asphalt 76t Asphalt
Steel 96t Steel, Mechanical components 4.4t Mechanical components
30 95 MWh 1.60 MW 242 m Access 1x road access
4x Pipeline connection
Stations for 2 ships.
L/U 3

References

  1. Available from Workers & resources: Soviet Republic patch 0.8.9
  2. 2.0 2.1 Available from Workers & resources: Soviet Republic patch 0.9.0