Dry-bulk Storage

From Workers & Resources: Soviet Republic Official Wiki
Revision as of 18:01, 11 February 2024 by workers-resources-fandom>Mrd.escher (Typo)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Dry-bulk storages are storages for storing raw materials/dry-bulks useful for the production of semi-finished products in Workers and Resources: Soviet Republic.

Background

Dry-bulk storage refers to the storage of goods that do not require refrigeration or temperature control, such as grains, ores and coal. These materials are typically stored in large quantities in specialized facilities like silos, warehouses, or storage tanks. Dry-bulk storage plays a crucial role in various industries, including agriculture, mining, construction, and manufacturing. It allows for efficient handling, transportation, and distribution of bulk goods. Proper storage conditions are essential to prevent spoilage, contamination, or degradation of the stored materials. Advanced technology, such as automated handling systems and moisture control, is often employed to optimize dry-bulk storage operations.

Gameplay

Dry-bulk storages are placed by the player near plants with dry-bulk in- or output, dry-bulk storages and/or near road/rail loading/unloading stations. Each Dry-bulk storage can only store one kind of dry-bulk which has to be assigned by the player. Dry-bulk can be delivered to the dry-bulk storage by using dry-bulk tank trucks or by using conveyor belts.

Dry-bulks

Stored in dry-bulk storage.

Transportation

Dry-bulk must be transported by using dry-bulk tank trucks, train cement tanks and via conveyor belts.

Buildings related to dry-bulk storages

Storages

Name Cost Lifespan Energy Wattage Storage capacity Structure Notes
Cement silo-toolbar.png
Cement silo
Workdays 1453 Workdays, Concrete 233 Concrete,
Gravel 20 Gravel, Asphalt 16 Asphalt
Steel 62 Steel, Mechanical components 0.31 Mechanical components
30 15 MWh 260 kW Cement 1400 Cement
Access 1x road access
3x Conveyor connection
L/U 2
Tool alumina storage.png
Dry-bulk storage
Workdays 1303 Workdays, Concrete 238 Concrete,
Gravel 23 Gravel
Steel 47 Steel
30 9.6 MWh 160 kW Cement 1150 Cement
Aluminium oxide 1150 Aluminium oxide
Access 1x road access
3x Conveyor connection
L/U 1
DryBulkSilo1.png
Dry-bulk storage
Workdays 2617 Workdays, Concrete 422 Concrete,
Gravel 50 Gravel, Asphalt 40 Asphalt
Steel 89 Steel, Mechanical components 1.8 Mechanical components
30 57 MWh 959 kW Cement 2300 Cement
Aluminium oxide 2300 Aluminium oxide
Access 1x road access
4x rail access
9x Conveyor connection
5x Factory connection
Station length: 76m
L/U 2
DryBulkSilo2.png
Dry-bulk storage
Workdays 1101 Workdays, Concrete 186 Concrete,
Gravel 18 Gravel, Asphalt 14 Asphalt
Steel 40 Steel, Mechanical components 0.63 Mechanical components
30 19 MWh 320 kW Cement 1000 Cement
Aluminium oxide 1000 Aluminium oxide
Access 4x road access
4x rail access
6x Conveyor connection
5x Factory connection
L/U 2
DryBulkSilo3.png
Dry-bulk storage
Workdays 2371 Workdays, Concrete 376 Concrete,
Gravel 46 Gravel, Asphalt 37 Asphalt
Steel 79 Steel, Mechanical components 1.7 Mechanical components
30 19 MWh 320 kW Cement 2300 Cement
Aluminium oxide 2300 Aluminium oxide
Access 1x road access
7x Conveyor connection
6x Factory connection
L/U 2

Conveyor belts

Name Cost Lifespan Energy Wattage Structure Notes
Tool bulk.png
Build dry-bulk conveyor connection
Workdays Workdays, Steel Steel, Mechanical components Mechanical components
Usage depends on length.
Access 1x road access
3x Conveyor connection
L/U
Tool bulk engine.png
Dry-bulk conveyor engine/transfer
Workdays Workdays, Concrete Concrete,
Gravel Gravel, Asphalt Asphalt
Steel Steel, Mechanical components Mechanical components
Usage depends on height.
28 6.0 MWh 99 kW Access 1x road access
3x Conveyor connection
L/U
Tool bulk engine 3in e.png
Dry-bulk conveyor engine/transfer
Workdays Workdays, Concrete Concrete,
Gravel Gravel, Asphalt Asphalt
Steel Steel, Mechanical components Mechanical components
Usage depends on height.
28 6.0 MWh 99 kW Access 1x road access
3x Conveyor connection
L/U
Tool bulk engine overpasse.png
Dry-bulk conveyor overpass
Workdays 431 Workdays, Concrete 8.6 Concrete,
Gravel 6.6 Gravel, Asphalt 5.3 Asphalt
Steel 11 Steel, Mechanical components 2.4 Mechanical components
28 6.0 MWh 99 kW Access 2x road access
2x Conveyor connection
L/U
Tool bulk engine overpassf.png
Dry-bulk conveyor overpass
Workdays 509 Workdays, Concrete 10 Concrete,
Gravel 8.2 Gravel, Asphalt 6.6 Asphalt
Steel 13 Steel, Mechanical components 2.8 Mechanical components
28 6.0 MWh 99 kW Access 2x road access
4x Conveyor connection
L/U
Tool bulk engine overpassg.png
Dry-bulk conveyor overpass
Workdays 509 Workdays, Concrete 10 Concrete,
Gravel 8.2 Gravel, Asphalt 6.6 Asphalt
Steel 13 Steel, Mechanical components 2.8 Mechanical components
28 6.0 MWh 99 kW Access 2x road access
4x Conveyor connection
L/U

Dry-bulk loading/Unloading

Name Cost Lifespan Energy Wattage Length Structure Notes
Tool bulk road station.png
Road dry-bulk loading/unloading
Workdays 364 Workdays, Concrete 6.0 Concrete,
Gravel 4.6 Gravel, Steel 20 Steel,
Mechanical components 0.75 Mechanical components
28 33 MWh 559 kW Access 1x road access
6x Conveyor connection
L/U 2
Tool bulk rail station.png
Railway dry-bulk loading/unloading
Workdays 900 Workdays, Concrete 9.4 Concrete,
Gravel 7.3 Gravel, Steel 48 Steel,
Mechanical components 2.9 Mechanical components
28 134 MWh 2.24 MW 93 m Access 1x road access
8x Conveyor connection
L/U 2