Open Storage: Difference between revisions

From Workers & Resources: Soviet Republic Official Wiki
workers-resources-fandom>Mrd.escher
m (Added references)
 
m (1 revision imported)
 

Latest revision as of 18:05, 14 June 2024

Open storages are storages for storing intermediate resources for the production of products in Workers and Resources: Soviet Republic.

Background

Open storage refers to a designated area, typically outdoors, utilized for the temporary or long-term storage of various resources such as steel, prefabricated panels, bricks, and other construction materials. These areas are often organized and accessible for easy retrieval and transportation. Open storage facilities play a crucial role in logistics and construction industries, providing ample space for stockpiling materials while allowing for efficient inventory management and distribution. They are essential for accommodating large quantities of goods, facilitating construction projects, and ensuring smooth supply chain operations.

Gameplay

Open storages are placed by the player near production sites. Each Open storage can store sevaral kind of resources. Open storage resources can be delivered to the open storage by using open hull trucks or by using Forklifts via Factory connections.

Open storage resources

Resources stored in open storage.

Transportation

Open storage resources can be transported in open hull trucks, railway open cars and with Forklifts via Factory connections.

Buildings related to open storages

Storages

Name Cost Lifespan Energy Wattage Storage capacity Structure Notes
Tool warehouse open.png
Open storage (small)
Workdays 462 Workdays, Concrete 14 Concrete,
Gravel 10 Gravel, Asphalt 8.7 Asphalt
Steel 10 Steel, Mechanical components 2.2 Mechanical components
30 20 MWh 349 kW Steel 330 Steel
Aluminium 330 Aluminium
Prefab panels 297 Prefab panels
Bricks 264 Bricks
Wood 330 Wood
Boards 330 Boards
Uranium oxide 198 Uranium oxide
Plastic waste 264 Plastic waste
Access 1x road access
3x Factory connection
L/U 2
Tool warehouse open combined big.png
Open storage (medium)
Workdays 675 Workdays, Concrete 16 Concrete,
Gravel 13 Gravel, Asphalt 10 Asphalt
Steel 34 Steel, Mechanical components 1.0 Mechanical components
30 26 MWh 446 kW Steel 1170 Steel
Aluminium 1170 Aluminium
Prefab panels 1053 Prefab panels
Bricks 936 Bricks
Wood 1170 Wood
Boards 1170 Boards
Uranium oxide 702 Uranium oxide
Plastic waste 936 Plastic waste
Access 1x road access
3x Factory connection
2x Railway connection
Station length: 83 m.
L/U 2
Tool muddy openstorage.png
Open storage (Free)
Free Steel 95 Steel
Aluminium 95 Aluminium
Prefab panels 85 Prefab panels
Bricks 76 Bricks
Wood 95 Wood
Boards 95 Boards
Uranium oxide 57 Uranium oxide
Plastic waste 76 Plastic waste
Access 1x road access
L/U 1

Factory connection

Main article: Factory connection
Name Cost Stations for helicopters Wattage Storage Structure Notes
Tool forklift crossing.png
Factory connection crossing
Workdays 54 Workdays, Concrete 4.6t Concrete,

Gravel 3.6t Gravel,Asphalt 2.9t Asphalt

- 3.0 MWh 50 kW - Access 4x factory connection
L/U -
Tool factoryconnection.png
Build factory connection
Workdays Workdays, Gravel Gravel,

Asphalt Asphalt
Usage depends on length.

Access
L/U

Open storage loading/unloading

Name Cost Lifespan Energy Wattage Length Structure Notes
Road cargo station.png
Road cargo station
Workdays 240 Workdays, Concrete 26 Concrete,
Gravel 6.3 Gravel, Asphalt 5.1 Asphalt
Steel 9.5 Steel
28 3.0 MWh 50 kW Access 1x road access
4x Factory connection
L/U 4
Tool road cargo station small.png
Road cargo station[1]
Workdays 299 Workdays, Concrete 30 Concrete,
Gravel 9.5 Gravel, Asphalt 7.6 Asphalt
Steel 10 Steel
28 3.0 MWh 50 kW Access 1x road access
4x Factory connection
L/U 6
Tool road cargo station big.png
Road cargo station[1]
Workdays 150 Workdays, Concrete 15 Concrete,
Gravel 3.2 Gravel, Asphalt 2.5 Asphalt
Steel 6.9 Steel
28 3.0 MWh 50 kW Access 1x road access
4x Factory connection
L/U 2
Tool rail station cargo.png
Cargo train station
Workdays 561t Workdays, Concrete 63t Concrete,
Gravel 26t Gravel, Steel 9.1t Steel
28 3.0 MWh 50 kW 83 m Access 2x road access
4x Factory connection
4x Railway connection
L/U
Tool rail station cargo1.png
Cargo train station
Workdays 175 Workdays, Concrete 20t Concrete,
Gravel 8.1t Gravel, Steel 2.9t Steel
28 3.0 MWh 50 kW 54 m Access 2x road access
2x Factory connection
2x Railway connection
L/U
Tool rail station cargo2.png
Cargo train station
Workdays 641 Workdays, Concrete 83t Concrete,
Gravel 24t Gravel, Steel 15t Steel
28 3.0 MWh 50 kW 91 m Access 2x road access
6x Factory connection
8x Railway connection
L/U
Tool rail station cargo3.png
Cargo train station
Workdays 1013 Workdays, Concrete 113t Concrete,
Gravel 48t Gravel, Steel 16t Steel
28 3.0 MWh 50 kW 156 m Access 2x road access
8x Factory connection
4x Railway connection
L/U
CargoTrainStation1.png
Cargo train station
Workdays 1536 Workdays, Concrete 155t Concrete,
Gravel 91t Gravel, Steel 8.5t Steel
28 68 MWh 1147 kW 180 m Access 1x road access
20x Factory connection
4x Railway connection
L/U
CargoTrainStation2.png
Cargo train station
Workdays 2193 Workdays, Concrete 208t Concrete,
Gravel 127t Gravel, Steel 10t Steel,
Bricks 7.2t Bricks, Boards 2.4t Boards
28 234 MWh 3.9 MW 196 m Access 1x road access
20x Factory connection
8x Railway connection
L/U
CargoTrainStation3.png
Cargo train station
Workdays 2875 Workdays, Concrete 261t Concrete,
Gravel 163t Gravel, Steel 13t Steel,
Bricks 16t Bricks, Boards 5.5t Boards
28 312 MWh 5.2 MW 208 m Access 1x road access
22x Factory connection
12x Railway connection
L/U

References

  1. 1.0 1.1 Available from Workers & resources: Soviet Republic patch 0.9.0