Waste management: Difference between revisions

From Workers & Resources: Soviet Republic Official Wiki
 
m (1 revision imported)
(No difference)

Revision as of 18:24, 14 June 2024

Waste management is an optional feature and is only available when Waste Management is enabled in game settings.

Background

Waste management includes the processes and actions required to manage waste from its inception to its final disposal. This includes the collection, transport, treatment and disposal of waste, together with monitoring and regulation of the waste management process and waste-related laws, technologies, economic mechanisms.

Waste can be solid, liquid, or gases and each type has different methods of disposal and management. Waste management deals with all types of waste, including industrial, biological, household, municipal, organic, biomedical, radioactive wastes. In some cases, waste can pose a threat to human health. Health issues are associated throughout the entire process of waste management. Health issues can also arise indirectly or directly. Directly, through the handling of solid waste, and indirectly through the consumption of water, soil and food. Waste is produced by human activity, for example, the extraction and processing of raw materials. Waste management is intended to reduce adverse effects of waste on human health, the environment, planetary resources and aesthetics.

The aim of waste management is to reduce the dangerous effects of such waste on the environment and human health. A big part of waste management deals with municipal solid waste, which is created by industrial, commercial, and household activity.

Gameplay

When the game setting Waste management is enabled workers and many buildings create waste. This waste must be disposed or otherwise the republic will become polluted. To take care of waste the player has to provide vehicles and buildings to the republic. The player must collect the waste and make a decision what to do with the waste? Export via a Customs house and pay for the disposal or process it first and export it afterwards?

A way to dispose waste is to burn it or separate the waste. By separating waste the player is able to retrieve Plastic waste, Metal scrap and other resources from the waste for further processing or export. Resources from the separation process can be recycled to retrieve processed resources like Steel, Gravel, Plastic and others. If, in the end, there is still waste remaining, the player still can choose to burn it or export the remaining waste and pay for the disposal. For separation, recycling or burning of waste there are several buildings available, just as several waste storage buildings.

The waste itself is produced by workers living in residential houses or at places where the workers go to work. Waste is also produced by buildings like factories. All this waste has to be collected and processed and/or exported over the border. For transporting waste there are several road vehicles available like garbage and container trucks. These trucks pick up waste from buildings or from collection points near buildings and transport it for processing or export.

There are different kinds of waste, like Construction waste, Plastic waste, Metal scrap, Biological waste etc. Also Mixed waste is available which, as the name implies, is a mix of different kinds of waste. Mixed waste can be processed to break it down into several other kinds of waste and later on recycled to get the processed resources out of it.

Demolition is also an additional option in game settings in combination with Waste management. With demolition the player has the option to mark a building for demolition and the demolition process starts. This process contains tearing down the building by workers or blow it up with Explosives. After demolition garbage and container trucks handle the waste, leaving a clean spot for the player to put another building in.

General

The player has three options with Waste management:

  • Disabled
  • Waste
  • Waste + Demolition

When only Waste is selected the player needs to take care of the waste that is being produced in the republic by citizens and waste producing buildings like factories. Take care with the means of picking up the waste, process the waste in separation and or recycling plants. The player can ultimately choose to burn the remaining garbage or export it across the border.

There is another setting which contains the settings from Waste but with the addition of demolition. Demolition comes with a Demolition office from where the player can assign buildings to demolish. The demolition is a process where workers and road vehicles handle the demolishing of the building and Big container truck take care of the waste. The waste will be processed as the player configures the waste buildings to his needs.

Waste

Waste is being produced at places where workers live or work. Every building, where waste is produced, has default storage available, the Internal garbage container stand. When there are Trash containers in the neighbourhood the waste is collected there and not in the waste producing building anymore. Garbage trucks will collect the waste from buildings and trash containers.

The waste collected from buildings and waste containers is a mix of different types of waste, named Mixed waste. The player can check the composition of the waste by hovering over the mixed waste icon or over a trash container icon and a small window appears with a description in percentages of how the waste is composed.

There are different types of waste

  • Biological waste: When this waste is left in the storage it can turn into Fertilizer or it can be processed into fertilizer in a Composting plant. You can burn Biological waste but it won't generate much heat.
  • Metal waste: Can be separated from waste and it becomes Metal scrap or Aluminium scrap after separation in Separation plants. Scrap can be stored in aggregate storage and it can't be burned.
  • Construction waste: Is not burnable and can also be separated from waste and it turns into construction rubble. In a Gravel recycling plant the Construction waste is turned into Gravel and re-usable in Construction.
  • Plastic waste: When separated from waste the Plastic waste can be transported to a Plastic recycling plant where new Plastic is created from the waste. Plastic waste can be burned, but has low heat value. When burning plastic waste it produces a higher amount of pollution, because it's a product based upon oil.
  • Hazardous waste: This waste is generated at Hospitals and Clinics and cannot be processed to anything. This is a very polluting waste because it pollutes when stored or when burned. When burning, hazardous waste has low heat value but very high pollution.
  • Burnable waste: Think of remains from Boards or so, which are burnable with high heat value, and have relatively low pollution.
  • Other waste: Unspecified waste which cannot be recycled but can be burned with medium heat value.
  • Ash: In general, when something is burned (except scrap and construction rubble), ashes are created which cannot be burned anymore.

Waste collection

Waste is by default collected in the building in a garbage container stand. When the player opens the properties window of the selected building information is displayed about waste at the item 'Internal garbage container stand'. The internal storage is limited and depends on the functionality of the building. Buildings where workers live have limited storage capacity, while factories producing goods/resources can have a bigger storage capacity.

The player can increase the storage capacity of storing waste near buildings by placing Trash containers/Stand for garbage containers. The player has to take in account that when a trash container/Stand for garbage containers is placed, nearby a building, the default storage for the building will become the Trash container/Stand for garbage containers and the internal garbage container stand in the building is not being used anymore. These Trash containers/Stand for garbage containers collect only waste which is produced by workers living in residential buildings and/or working in factories. Waste produced from processing waste will not be stored in Trash containers//Stand for garbage containers.

Waste is being picked up by Garbage trucks or Big container trucks. The big containers are usually used by factories but can also be provided in residential areas at container stands. The player has to take in account that these container stands in common, should be in close range of the buildings, workers walk only a limited distance (approx. 125m on gravel footpath) with their waste. The advantage of using container stands is that the Garbage trucks don't have to pick up the waste from each individual building.

There are specific trucks for specific containers, meaning that the waste trucks can not pick up every container. The garbage truck can only pick up the small containers while the Big container truck can only pick up the big containers. The home for garbage trucks and/or big container trucks is the Technical services building. When the technical services building is selected by the player, the player can set sources where the garbage trucks and/or big container trucks, belonging to that technical services building, should deliver the waste. The player can assign sources for:

  • Metal scrap
  • Aluminium scrap
  • Biological waste
  • Plastic waste
  • Hazardous waste
  • Mixed waste

When a garbage truck/big container truck is fully loaded with waste, the truck delivers the waste to a source, as assigned in the technical services building. A garbage truck/big container truck can also be scheduled on a direct line.

Waste processing

Waste will eventually have to leave the republic. But before this happens, the waste can be processed first. Waste processing takes place in two steps:

  • Separation
  • Recycling

The waste contains processed raw materials that can be recovered. To do this, the waste must be separated first. The separation of waste takes place in a separation plant. Garbage trucks and big container trucks deliver mixed waste to the the separation plant. The mixed waste is processed and separated after which different types of waste are created. Think of Construction waste, Aluminium scrap, Metal scrap, Plastic waste. In addition to these types of waste, mixed waste is created again, but with a different composition than that what was delivered at the separation plant. It has no use to provide this mixed waste to a separation plant again, because all the processed raw materials are already separated.

With the separated waste, the player now has the option to extract processed raw materials from the waste. These raw materials can be Steel, Aluminium, Plastic and Gravel and can be extracted from the associated waste. The waste must be transported from the separation plant to a Recycling plant. A corresponding recycling plant is available for each of the four processed raw materials just mentioned. The transport of the waste between those plants is handled by big container trucks.

Waste disposal

At any time the player can choose to dispose the waste by burning it or by exporting across the border via a customs house. There is a downside about burning waste and that is Pollution. Waste is burned in an Incinerator and if the player chooses to burn the waste he can choose from several incinerators. There are even Incinerators which are generating power or heat from burning waste. In the end, Mixed waste remains, which mainly consists of ash.

Waste Storage

Waste can be stored in dumps or in big containers. In big containers the storage is very limited while in dumps there is a lot of storage space. The downside of dumps without claw machines is that loading of waste trucks takes a lot of time, making these dumps more like landfills. Loading from dumps with claw machines is very fast for waste trucks. The Transfer for big containers is actually a parking place for containers. A big container truck is the only waste truck which can use this facility. The loading and unloading for big containers is fast.

Dumps and Transfer for big containers have a Factory connection so that they can be connected to factories. When connecting waste storage to factories the player needs to take in account that these storage are only an extension of the internal storage of the factory. These storages will not be handled from the Technical services building. The behaviour for connecting waste storage via a factory connection to Separation plants differs from other buildings. The factory connection can only work between those two structures if the two-way factory connection is converted into a one-way factory connection.

Notes

  • Walking distance for workers to container stands is limited to 125m over a gravel footpath.
  • A Trash container or Stand near a industrial building only collects the waste which are produced by the workers working at that building, not the processed waste from a separation plant.
  • When a container stand is nearby a building, this container stand will be the default place where waste is collected, leaving the internal garbage container stand of the building unused.
  • It is useless to provide mixed waste from a separation plant to the same or another separation plant, because all the processed raw materials are already separated.
  • One-way factory connections must be used between waste storage and separation plants.

Buildings related to waste

Trash containers

Name Cost Lifespan Storage Structure Notes
Tool containerstand small.png
Stand for small waste containers (small)
Workdays 17 Workdays, Concrete 0.88t Concrete,
Gravel 0.68t Gravel, Asphalt 0.54t Asphalt,
Prefab panels 0.79t Prefab panels, Steel 0.079t Steel
20 years Mixed waste 0.72t Mixed waste 1x Road access
Tool containerstand small pede.png
Stand for small waste containers (small)
Workdays 17 Workdays, Concrete 0.88t Concrete,
Gravel 0.68t Gravel, Prefab panels 0.79t Prefab panels,
Steel 0.079t Steel
20 years Mixed waste 0.72t Mixed waste 1x Footpath access
Tool containerstand big.png
Stand for small waste containers (large)
Workdays 50 Workdays, Concrete 3.3t Concrete,
Gravel 2.6t Gravel, Asphalt 2.0t Asphalt,
Prefab panels 1.6t Prefab panels, Steel 0.16t Steel
20 years Capacity 2.2t with a mix of:
Mixed waste Mixed waste, Metal scrap Metal scrap,
Aluminium scrap Aluminium scrap, Plastic waste Plastic waste,
Biological waste Biological waste, Hazardous waste Hazardous waste
1x Road access
Tool containerstand big pede.png
Stand for small waste containers (large)
Workdays 50 Workdays, Concrete 0.88t Concrete,
Gravel 0.68t Gravel, Prefab panels 0.79t Prefab panels,
Steel 0.079t Steel
20 years Capacity 2.2t with a mix of:
Mixed waste Mixed waste, Metal scrap Metal scrap,
Aluminium scrap Aluminium scrap, Plastic waste Plastic waste,
Biological waste Biological waste, Hazardous waste Hazardous waste
1x Footpath access
Tool bigcontainerstand.png
Stand for big waste containers (small)
Workdays 49 Workdays, Concrete 3.2t Concrete,
Gravel 2.5t Gravel, Asphalt 2.0t Asphalt,
Prefab panels 1.6t Prefab panels,Steel 0.16t Steel
20 years Capacity 52t with a mix of:
Mixed waste Mixed waste, Metal scrap Metal scrap,
Aluminium scrap Aluminium scrap, Plastic waste Plastic waste,
Biological waste Biological waste, Hazardous waste Hazardous waste
1x Road access
Tool bigcontainerstand big.png
Stand for small waste container (large)
Workdays 171 Workdays, Concrete 12t Concrete,
Gravel 9.8t Gravel, Asphalt 7.8t Asphalt,
Prefab panels 3.5t Prefab panels,Steel 0.35t Steel
20 years Capacity 52t with a mix of:
Mixed waste Mixed waste, Metal scrap Metal scrap,
Aluminium scrap Aluminium scrap, Plastic waste Plastic waste,
Biological waste Biological waste, Hazardous waste Hazardous waste
1x Road access

Separation plants

Name Cost Workers Consumption Pollution Energy Wattage Storage Structure Notes
Tool waste generalseparation.png
General separation
See below Workers.png 50 Mixed waste 50t Mixed waste
Water 1.00m3/day Water
Power 1.8MWh Power
2.40 tons/year 3.3 MWh 55 kW Dump Mixed waste 80t Mixed waste (import)
Big garbage container Mixed waste 50t Mixed waste (export)
Aggregate storage Construction waste 20t Construction waste (export)
Aggregate storage Metal scrap 12t Metal scrap (export)
Aggregate storage Aluminium scrap 14t Aluminium scrap (export)
Open space storage Plastic waste 16t Plastic waste (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 1x road access
3x Footpath access
1x Factory connection
1x Conveyor connection
L/U 2
Tool waste steelseparation.png
Scrap separation
See below Workers.png 15 Mixed waste 320t Mixed waste
Water 0.30m3/day WaterPower 6.0MWh Power
2.40 tons/year 6.5 MWh 107 kW Dump Mixed waste 60t Mixed waste (import)
Big garbage container Mixed waste 30t Mixed waste (export)
Aggregate storage Metal scrap 18t Metal scrap (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 1x road access
2x Footpath access
1x Factory connection
1x Conveyor connection
L/U 2
Tool waste aluminiumseparation.png
Aluminium separation
See below Workers.png 20 Mixed waste 20t Mixed waste
Water 0.40m3/day WaterPower 6.0MWh Power
2.40 tons/year 6.6 MWh 110 kW Dump Mixed waste 45t Mixed waste (import)
Big garbage container Mixed waste 30t Mixed waste (export)
Aggregate storage Aluminium scrap 14t Aluminium scrap (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 3x footpath access
1x road access
3x factory connection
L/U 2

Recycling plants

Name Cost Workers Consumption Production Pollution Energy Wattage Storage Structure Notes
Tool waste gravelrecycling.png
Gravel recycling plant
See below Workers.png 15 Construction waste 90t Construction waste
Water 0.30m3/day Water
Power 18MWh Power
Gravel 60t Gravel 4.20 tons/year 18 MWh 307 kW Aggregate storage Construction waste 40t Construction waste (import)
Aggregate storage Gravel 270t Gravel (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 1x road access
2x Footpath access
1x Conveyor connection (import)
2x Conveyor connection (export)
L/U 2
Tool waste plasticrecycling.png
Plastic recycling plant
See below Workers.png 20 Plastic waste 10t Plastic waste
Water 0.40m3/day WaterPower 4.2MWh Power
Plastic 2.0t Plastic 3.30 tons/year 4.8 MWh 80 kW Open space storagePlastic waste 24t Plastic waste (import)
Warehouse Plastic 7.5t Plastic (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 1x road access
3x footpath access
3x factory connection
L/U 2
Tool waste steelrecycling.png
Steel recycling plant
See below Workers.png 30 Metal scrap 36t Metal scrap
Water 0.60m3/day Water
Steel 19t Steel 9.60 tons/year 3.0 MWh 50 kW Aggregate storage Metal scrap 36t Metal scrap (import)
Open space storageSteel 50t Steel (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 1x road access
2x footpath access
2x factory connection
2x Conveyor connection (import)
L/U 3
Tool waste aluminiumrecycling.png
Aluminium recycling plant
See below Workers.png 25 Aluminium scrap 25t Aluminium scrap
Water 0.50m3/day Water
Aluminium 12t Aluminium 7.20 tons/year 3.0 MWh 50 kW Aggregate storage Aluminium scrap 35t Aluminium scrap (import)
Open space storageAluminium 40t Aluminium (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 3x footpath access
1x road access
3x factory connection
L/U 2
Tool waste treatment plant.png
Waste treatment plant
See below Workers.png 30 Hazardous waste 7.5t Hazardous waste
Chemicals 3.8t Chemicals
Water 0.60m3/day Water
Hazardous waste 3.0t Hazardous waste 8.00 tons/year 3.0 MWh 50 kW Dump Hazardous waste 100t Hazardous waste (import)
WarehouseChemicals 6.0t Chemicals (import)
Dump Mixed waste 50t Mixed waste (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 4x footpath access
1x road access
9x factory connection
L/U 3

Incinerators

Name Cost Workers Consumption Pollution Energy Wattage Storage Structure Notes
Tool incinerator small.png
Incinerator (small)
See below Workers.png 15 Mixed waste 30t Mixed waste
Water 0.30m3/day Water
59.40 tons/year 3.0 MWh 50 kW Dump Mixed waste 55t Mixed waste (import)
Big garbage container Mixed waste 32t Mixed waste (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 1x road access
2x Footpath access
2x Factory connection (import)
L/U 2
Tool incinerator big.png
Incinerator (large)
See below Workers.png 25 Mixed waste 58t Mixed waste
Water 0.50m3/day Water
71.00 tons/year 30. MWh 50 kW Dump Mixed waste 95t Mixed waste (import)
Big garbage container Mixed waste 78t Mixed waste (export)
Big garbage container Mixed waste 6.5t Mixed waste (export)
Access 1x road access
2x Footpath access
2x Factory connection (import)
L/U 2
Tool incinerator powerplant.png
Incinerator - Power plant
See below - - - - - - Access - See Incinerator - Power plant
L/U -
Tool incinerator heat.png
Incinerator - Heating plant
See below - - - - - - Access - See Incinerator - Heating plant
L/U -

Scrapyards

Name Cost Workers Consumption Production Lifespan Energy Wattage Storage Structure Notes
Scrapping facility1.png
Scrapping facility (smaller)
See below Workers.png 50 Water 1.00m3/h Water Mixed waste 0.20kg per worker Mixed waste 20 years 3.0 MWh 50 kW 40t Steel Steel(export)
40t Aluminium Aluminium(export)
10t Mechanical components Mechanical components(export)
7.0t Electro components Electro components(export)
24t Metal scrap Metal scrap(export)
21t Aluminium scrap Aluminium scrap(export)
50t Mixed waste Mixed waste(export)
Access 1x road access
L/U 3
Scrapping facility1.png
Scrapping facility (larger)
See below Workers.png 120 Water 2.40m3/h Water Mixed waste 0.20kg per worker Mixed waste 20 years 3.6 MWh 60 kW 80t Steel Steel(export)
80t Aluminium Aluminium(export)
20t Mechanical components Mechanical components(export)
14t Electro components Electro components(export)
54t Metal scrap Metal scrap(export)
28t Aluminium scrap Aluminium scrap(export)
110t Mixed waste Mixed waste(export)
Access 1x road access
L/U 3
Scrapping facility ship1.png
Ship scrapping facility (smaller)
See below Workers.png 90 Water 1.80m3/h Water Mixed waste 0.20kg per worker Mixed waste 20 years 3.0 MWh 50 kW 80t Steel Steel(export)
20t Mechanical components Mechanical components(export)
14.0t Electro components Electro components(export)
48t Metal scrap Metal scrap(export)
85t Mixed waste Mixed waste(export)
Access 1x road access
L/U 3
Scrapping facility ship2.png
Ship scrapping facility (larger)
See below Workers.png 280 Water 5.60m3/h Water Mixed waste 0.20kg per worker Mixed waste 20 years 8.4 MWh 140 kW 150t Steel Steel(export)
40t Mechanical components Mechanical components(export)
28t Electro components Electro components(export)
150t Metal scrap Metal scrap(export)
190t Mixed waste Mixed waste(export)
Access 1x road access
L/U 3

Storages

Name Cost Lifespan Energy Wattage Storage Structure Notes
Tool waste storage basic small.png
Dump (small)
Workdays 101 Workdays, Concrete 8.7t Concrete,
Gravel 6.7t Gravel
20 years None None Mixed waste 80t Mixed waste Access 1x Road access
3x Factory connection
L/U 1
Tool waste storage basic big.png
Dump (medium)
Workdays 101 Workdays, Concrete 8.7t Concrete,
Gravel 6.7t Gravel
20 years None None Mixed waste 270t Mixed waste Access 1x Road access
3x Factory connection
L/U 2
Tool muddy landfill.png
Dump (free)
None 20 years None None Mixed waste 140t Mixed waste Access 1x road access
L/U 1
Tool waste storage crane small.png
Dump with claw machine(small)
See below 20 years 11 MWh 186 kW Mixed waste 130t Mixed waste Access 1x Road access
2x Factory connection
L/U 2
Tool waste storage crane big.png
Dump claw machine(large)
See below 20 years 11 MWh 186 kW Mixed waste 350t Mixed waste Access 1x Road access
3x Factory connection
L/U 2
Tool containerstorage small.png
Transfer for big waste containers (small)
See below 20 years 3.0 MWh 50 kW 15 Waste containers Access 1x Road access
3x Factory connection
L/U 1
Tool containerstorage bigl.png
Transfer for big waste containers (large)
See below 20 years 3.0 MWh 50 kW 30 Waste containers Access 1x Road access
3x Factory connection
L/U 2


Construction

General separation
RequirementsGroundworks
Workdays 1185 Workdays
Asphalt 23t Asphalt
Gravel 28t Gravel
Steel 58t Steel
Building
Asphalt 23t Asphalt
Gravel 28t Gravel
Mechanisms: Excavators
(max. 5)
Needs workers No
(max. 118)
Scrap separation
RequirementsGroundworks
Asphalt 9.2t Asphalt
Gravel 11t Gravel
Steel 24t Steel
Building
Asphalt 9.2t Asphalt
Gravel 11t Gravel
Mechanisms: Excavators
(max. 3)
Needs workers No
(max. 51)
Aluminium separation
RequirementsGroundworks
Asphalt 10t Asphalt
Gravel 12t Gravel
Steel 25t Steel
Building
Asphalt 10t Asphalt
Gravel 12t Gravel
Mechanisms: Excavators
(max. 5)
Needs workers No
(max. 54)
Gravel recycling plant
RequirementsGroundworks
Asphalt 20t Asphalt
Gravel 25t Gravel
Steel 24t Steel
Building
Asphalt 20t Asphalt
Gravel 25t Gravel
Mechanisms: Excavators
(max. 5)
Needs workers No
(max. 80)
Plastic recycling plant
RequirementsGroundworks
Asphalt 8.5t Asphalt
Gravel 10t Gravel
Steel 22t Steel
Building
Asphalt 8.5t Asphalt
Gravel 10t Gravel
Mechanisms: Excavators
(max. 3)
Needs workers No
(max. 57)
Steel recycling plant
RequirementsGroundworks
Workdays 1122 Workdays
Asphalt 18t Asphalt
Gravel 22t Gravel
Steel 50t Steel
Building
Asphalt 18t Asphalt
Gravel 22t Gravel
Mechanisms: Excavators
(max. 4)
Needs workers No
(max. 111)
Aluminium recycling plant
RequirementsGroundworks
Asphalt 11t Asphalt
Gravel 14t Gravel
Steel 26t Steel
Building
Asphalt 11t Asphalt
Gravel 14t Gravel
Mechanisms: Excavators
(max. 4)
Needs workers No
(max. 66)
Waste treatment plant
RequirementsGroundworks
Workdays 2271 Workdays
Asphalt 58t Asphalt
Concrete 165t Concrete
Gravel 73t Gravel
Steel 32t Steel
Bricks 45t Bricks
Boards 15t Boards
Building
Workdays 1106 Workdays
Asphalt 58t Asphalt
Gravel 73t Gravel
Mechanisms: Excavators
(max. 7)
Needs workers No
(max. 226)
Incinerator (small)
RequirementsGroundworks
Workdays 2235 Workdays
Asphalt 19t Asphalt
Gravel 24t Gravel
Steel 34t Steel
Bricks 110t Bricks
Boards 36t Boards
Building
Asphalt 19t Asphalt
Gravel 24t Gravel
Mechanisms: Excavators
(max. 3)
Needs workers No
(max. 223)
Incinerator (large)
RequirementsGroundworks
Workdays 4992 Workdays
Asphalt 60t Asphalt
Gravel 75t Gravel
Steel 54t Steel
Bricks 284t Bricks
Boards 94t Boards
Building
Workdays 1129 Workdays
Asphalt 60t Asphalt
Gravel 75t Gravel
Mechanisms: Excavators
(max. 6)
Needs workers No
(max. 498)
Scrapping facility (smaller)
RequirementsGroundworks
Asphalt 20t Asphalt
Gravel 25t Gravel
Steel 17t Steel
Bricks 11t Bricks
Boards 3.8t Boards
Building
Asphalt 20t Asphalt
Gravel 25t Gravel
Mechanisms: Excavators
(max. 5)
Needs workers No
(max. 92)
Scrapping facility (Larger)
RequirementsGroundworks
Workdays 1620 Workdays
Asphalt 34t Asphalt
Concrete 104t Concrete
Gravel 43t Gravel
Steel 29t Steel
Bricks 26t Bricks
Boards 8.8t Boards
Building
Asphalt 34t Asphalt
Gravel 43t Gravel
Mechanisms: Excavators
(max. 5)
Needs workers No
(max. 161)
Ship scrapping facility (smaller)
RequirementsGroundworks
Workdays 3672 Workdays
Asphalt 87t Asphalt
Concrete 272t Concrete
Gravel 109t Gravel
Steel 74t Steel
Bricks 17t Bricks
Boards 5.9t Boards
Building
Workdays 1649 Workdays
Asphalt 87t Asphalt
Concrete 142t Concrete
Gravel 109t Gravel
Mechanisms: Excavators
(max. 2)
Needs workers No
(max. 366)
Ship scrapping facility (Larger)
RequirementsGroundworks
Workdays 5138 Workdays
Asphalt 122t Asphalt
Concrete 403t Concrete
Gravel 152t Gravel
Steel 106t Steel
Bricks 27t Bricks
Boards 9.3t Boards
Building
Workdays 2292 Workdays
Asphalt 122t Asphalt
Concrete 198t Concrete
Gravel 152t Gravel
Mechanisms: Excavators
(max. 2)
Needs workers No
(max. 513)
Dump (small)
RequirementsGroundworks
Concrete 8.1t Concrete
Concrete 8.1t Concrete
Gravel 6.7t Gravel
Building
Mechanisms: Excavators
(max. 1)
Needs workers No
(max. 50)
Dump (medium)
RequirementsGroundworks
Asphalt 16t Asphalt
Gravel 20t Gravel
Steel 0.58t Steel
Building
Asphalt 16t Asphalt
Gravel 20t Gravel
Mechanisms: Excavators
(max. 1)
Needs workers No
(max. 50)
Dump with claw machine (small)
RequirementsGroundworks
Workdays 1798 Workdays
Asphalt 13t Asphalt
Gravel 17t Gravel
Steel 54t Steel
Building
Asphalt 13t Asphalt
Gravel 17t Gravel
Mechanisms: Excavators
(max. 1)
Needs workers No
(max. 179)
Dump with claw machine (large)
RequirementsGroundworks
Workdays 3287 Workdays
Asphalt 27t Asphalt
Gravel 34t Gravel
Steel 97t Steel
Building
Asphalt 27t Asphalt
Gravel 34t Gravel
Mechanisms: Excavators
(max. 1)
Needs workers No
(max. 328)
Transfer for big waste containers (small)
RequirementsGroundworks
Asphalt 5.0t Asphalt
Concrete 8.2t Concrete
Gravel 6.3t Gravel
Steel 0.27t Steel
Building
Asphalt 5.0t Asphalt
Concrete 8.2t Concrete
Gravel 6.3t Gravel
Mechanisms: Excavators
(max. 1)
Needs workers No
(max. 50)
Transfer for big waste containers (large)
RequirementsGroundworks
Asphalt 12t Asphalt
Gravel 15t Gravel
Steel 0.45t Steel
Building
Asphalt 12t Asphalt
Gravel 15t Gravel
Mechanisms: Excavators
(max. 1)
Needs workers No
(max. 50)

Gallery