Sports: Difference between revisions

From Workers & Resources: Soviet Republic Official Wiki
workers-resources-fandom>Varga1069
(rewrote gameplay and background sections, tweaked influences section)
 
m (1 revision imported)
 

Latest revision as of 18:24, 14 June 2024

Background

Sport encompasses a broad spectrum of physical activities, spanning both indoor and outdoor arenas, demanding skill, strategy, and physical prowess. Indoor sports, like basketball, volleyball, and table tennis, are typically conducted within controlled environments such as gyms or arenas, providing opportunities for competition and recreation regardless of weather conditions. Conversely, outdoor sports such as soccer, tennis, and hiking unfold in natural settings, often involving interaction with the elements. These pursuits not only enhance physical fitness but also contribute to mental well-being and foster social interaction. With roots tracing back millennia, sports have evolved from simple contests to elaborate, organized events embraced by millions globally. Whether pursued casually or professionally, sports cultivate teamwork, discipline, and a profound sense of accomplishment among participants.

Gameplay

The player is responsible for maintaining the health of workers residing within the player's republic. By strategically positioning sports-related items near areas where workers unwind, the player can shape their health preferences. It's essential for the player to consider that outdoor sports activities are affected by seasonal changes. For instance, outdoor swimming requires temperatures above 15°C, whereas field sports like football, volleyball, and basketball are feasible above 5°C.

Main article: Sport

Influences

Sports related objects provide the following effects:

  • Positive effect on the citizens health stat.
    Main article: Health
  • Minor effect on citizens happiness stat.
    Main article: Happiness

Buildings related to sport

Name Cost Workers Visitors Lifespan Production Consumption Energy Wattage Structure Notes
Tennis Playground.png
Tennis playground
See below Workers.png 1 Visitors.png 5 22 3.0 MWh 50 kW Access 4x Footpath access
Requires weather temperature above 5°C.
L/U
Football Playground.png
Football playground
See below Workers.png 1 Visitors.png 22 22 3.0 MWh 50 kW Access 4x Footpath access
Requires weather temperature above 5°C.
L/U
OutdoorSwimmingPools.png
Outdoor swimming pool
See below Workers.png 15 Visitors.png 105 20 Mixed waste 0.32 kg/worker Mixed waste , Mixed waste 0.30 kg/customer Mixed waste Heat 6 m3 Heat,
Water 0.30 m3/day Water
3.0 MWh 50 kW Access 8x Footpath access
Requires weather temperature above 15C.
L/U
Playground1.png
Basketball and volleyball court
See below Workers.png 3 Visitors.png 21 22 Mixed waste 0.20 kg/worker Mixed waste , Mixed waste 0.20 kg/customer Mixed waste 3.0 MWh 50 kW Access 4x road access
Requires weather temperature above 5°C.
L/U
Playground2.png
Basketball and volleyball court
See below Workers.png 6 Visitors.png 48 22 Mixed waste 0.20 kg/worker Mixed waste , Mixed waste 0.20 kg/customer Mixed waste 3.0 MWh 50 kW Access 6x Footpath access
Requires weather temperature above 5°C.
L/U
Playground3.png
Football playground[1]
See below Workers.png 4 Visitors.png 32 22 Mixed waste 0.20 kg/worker Mixed waste , Mixed waste 0.20 kg/customer Mixed waste 3.0 MWh 50 kW Access 4x Footpath access
Requires weather temperature above 5°C.
L/U
Playground4.png
Volleybal court[1]
See below Workers.png 3 Visitors.png 15 22 Mixed waste 0.20 kg/worker Mixed waste , Mixed waste 0.20 kg/customer Mixed waste 3.0 MWh 50 kW Access 4x Footpath access
Requires weather temperature above 5°C.
L/U
Indoor pool-toolbar.png
Indoor pool
See below Workers.png 18 Visitors.png 90 20 Mixed waste 0.32 kg/worker Mixed waste , Mixed waste 0.30 kg/customer Mixed waste Heat 5 m3 Heat,
Water 0.36 m3/day Water
3.0 MWh 50 kW Access 3x Footpath access
1x road access
L/U
SportHall.png
Sport hall[1]
See below Workers.png 15 Visitors.png 105 20 Mixed waste 0.20 kg/worker Mixed waste , Mixed waste 0.20 kg/customer Mixed waste Heat 6 m3 Heat,
Water 0.30 m3/day Water
3.0 MWh 50 kW Access 9x Footpath access
L/U
SportHall2.png
Sport hall[1]
See below Workers.png 25 Visitors.png 175 20 Mixed waste 0.20 kg/worker Mixed waste , Mixed waste 0.20 kg/customer Mixed waste Heat 10 m3 Heat,
Water 0.50 m3/day Water
3.0 MWh 50 kW Access 10x Footpath access
L/U

Notes

Construction

Tennis playground
RequirementsGroundworks
Concrete 6.1 t Concrete
Gravel 4.7 t Gravel
Building
Concrete 6.1 t Concrete
Gravel 4.7 t Gravel
Mechanisms: Excavator
(max. 1)
Needs workers No
(max. 50)
Football playground
RequirementsGroundworks
Concrete 6.1 t Concrete
Gravel 4.7 t Gravel
Building
Concrete 6.1 t Concrete
Gravel 4.7 t Gravel
Mechanisms: Excavator
(max. 1)
Needs workers No
(max. 50)
Basketball and volleyball court
RequirementsGroundworks
Concrete 4.6 t Concrete
Gravel 3.5 t Gravel
Asphalt 2.8 t Asphalt
Building
Concrete 4.6 t Concrete
Gravel 3.5 t Gravel
Asphalt 2.8 t Asphalt
Mechanisms: Excavator
(max. 1)
Needs workers No
(max. 50)
Basketball and volleyball court
RequirementsGroundworks
Concrete 11 t Concrete
Gravel 8.7 t Gravel
Asphalt 6.9 t Asphalt
Building
Concrete 11 t Concrete
Gravel 8.7 t Gravel
Asphalt 6.9 t Asphalt
Mechanisms: Excavator
(max. 2)
Needs workers No
(max. 50)
Football playground[1]
RequirementsGroundworks
Concrete 11 t Concrete
Gravel 8.8 t Gravel
Building
Concrete 11 t Concrete
Gravel 8.8 t Gravel
Mechanisms: Excavator
(max. 1)
Needs workers No
(max. 50)
Volleyball court
RequirementsGroundworks
Concrete 3.1 t Concrete
Gravel 2.4 t Gravel
Asphalt 1.9 t Asphalt
Building
Concrete 3.0 t Concrete
Gravel 2.4 t Gravel
Asphalt 1.9 t Asphalt
Mechanisms: Excavator
(max. 1)
Needs workers No
(max. 50)
Indoor pool
RequirementsGroundworks
Concrete 31 t Concrete
Gravel 14 t Gravel
Asphalt 11 t Asphalt
Steel 8.5 t Steel
Bricks 37 t Bricks
Boards 12 t Boards
Building
Concrete 18 t Concrete
Gravel 14 t Gravel
Asphalt 11 t Asphalt
Mechanisms: Excavator
(max. 1)
Needs workers No
(max. 71)
Sport hall[1]
RequirementsGroundworks
Workdays 1921 Workdays
Concrete 130 t Concrete
Gravel 45 t Gravel
Asphalt 36 t Asphalt
Steel 25 t Steel
Bricks 77 t Bricks
Boards 25 t Boards
Building
Concrete 59 t Concrete
Gravel 45 t Gravel
Asphalt 36 t Asphalt
Mechanisms: Excavator
(max. 2)
Needs workers No
(max. 191)
Sport hall[1]
RequirementsGroundworks
Workdays 3859 Workdays
Gravel 91 t Gravel
Asphalt 73 t Asphalt
Steel 43 t Steel
Bricks 120 t Bricks
Boards 87 t Boards
Building
Workdays 1380 Workdays
Concrete 119 t Concrete
Asphalt 73 t Asphalt
Mechanisms: Excavator
(max. 5)
Needs workers No
(max. 358)
Outdoor swimming pool
RequirementsGroundworks
Gravel 25 t Gravel
Asphalt 20 t Asphalt
Steel 5.0 t Steel
Bricks 3.6 t Bricks
Boards 1.2 t Boards
Building
Concrete 33 t Concrete
Asphalt 20 t Asphalt
Mechanisms: Excavator
(max. 2)
Needs workers No
(max. 51)

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 Available from Workers & resources: Soviet Republic patch 0.8.9