Rail construction office

From Workers & Resources: Soviet Republic Official Wiki

The Rail Construction office functions similarly to the Construction Office, but can only construct railroad tracks. Rail offices are staffed by workers, who operate Track Builders and consume resources (the rail office has internal storage for all the materials it needs, so external storage is not required) to build tracks. The rail construction office differs from the construction office in that there is only one type of vehicle required, the track builder, and that workers report directly to the rail office instead of to the construction sites themselves.

For a guide to the construction process, see the construction page.

Construction

Rail construction office 4

RequirementsGroundworksBricks layingBricks laying
Workdays 1910 Workdays
Gravel 42t Gravel
Bricks 90t Bricks
Steel 18t Steel
Asphalt 34t Asphalt
Boards 42t Boards
Building
Asphalt 34t Asphalt
Gravel 42t Gravel
Mechanisms: Excavators
(max. 3)
Needs workers No
(max. 190)
Next
Workdays 1230 Workdays
Boards 35t Boards
Bricks 105t Bricks
Steel 13t Steel
Mechanisms: Road cranes/Tower cranes
(max. 3)
Needs workers Yes
(max. 207)
Next
Boards 14t Boards
Steel 8.4t Steel
Mechanisms: Road cranes/Tower cranes
(max. 3)
Needs workers Yes
(max. 207)

Rail construction office 8

RequirementsGroundworks
Workdays 4364 Workdays
Gravel 118t Gravel
Bricks 189t Bricks
Steel 37t Steel
Concrete 153t Concrete
Asphalt 94t Asphalt
Boards 85t Boards
Building
Workdays 1774 Workdays
Asphalt 94t Asphalt
Concrete 153t Concrete
Gravel 118t Gravel
Mechanisms: Excavators
(max. 3)
Needs workers No
(max. 436)