Iron ore processing plant

From Workers & Resources: Soviet Republic Official Wiki
Revision as of 17:56, 14 June 2024 by JKM (talk | contribs) (1 revision imported)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Iron ore processing plant is a building in Workers & Resources: Soviet Republic.

Name Cost Workers Production Consumption Pollution Energy Wattage Storage Structure Notes
Coal processing plant-toolbar.png
Iron ore processing plant
See below Workers.png 15 Iron 105t/day Iron Water 0.30m3/day Water
Iron ore 225t per workday Iron ore
12.00 tons/year 17 MWh 287 kW Iron ore 25t Iron ore (import)
Iron 25t Iron (export)
Access 3x footpath access
1x road access
4x Conveyor connection (input)
2x Conveyor connection (output)
L/U 2

Background

Iron ore is an important raw material for iron and steel production enterprises. In the iron ore processing plant, iron ore is processed into iron. The iron ore enters the plant and in the plant the iron ore is crushed, grinded, magnetic separated and gravity concentrated, etc, gradually the iron can be retrieved from natural minerals (iron ore). It is the mineral aggregates that contain iron or iron compounds which can be used economically.

Gameplay

Iron ore from the iron mine must be provided to the iron ore processing plant via a conveyor connection. The output is also a conveyor connectioniron via which the iron can be retrieved. The building must be equiopped with workers and electricity to function. Iron can be transported from the plant by dumper trucks, conveyors or aggregate storage cableways. Iron can be further processed in a steel mill into steel.

Production

Iron resource flow chart

Iron is produced from iron ore in a iron ore processing plant at a rate of 225t iron ore for 105t iron.

Storage

Iron or and iron may be stored in both small and large aggregate storage buildings.

Transportation

They can be transported by using dumper trucks or by trains using hopper cargo wagons.

Construction

RequirementsGroundworks
Workdays 4122 Workdays
Asphalt 52t Asphalt
Gravel 65t Gravel
Steel 200t Steel
Concrete 360t Concrete
Building
Asphalt 52t Asphalt
Gravel 65t Gravel
Mechanisms: Excavators
(max. 3)
Needs workers No
(max. 412)