Iron ore processing plant is a building in Workers & Resources: Soviet Republic.
Name | Cost | Workers | Production | Consumption | Pollution | Energy | Wattage | Storage | Structure | Notes | |
---|---|---|---|---|---|---|---|---|---|---|---|
Iron ore processing plant |
See below | 15 | Iron | 105t/dayWater 225t per workday Iron ore |
0.30m3/day 12.00 tons/year | 17 MWh | 287 kW | Iron ore (import) 25t Iron (export) |
25t Access | 3x footpath access 1x road access 4x Conveyor connection (input) 2x Conveyor connection (output) |
|
L/U | 2 |
Background
Iron ore is an important raw material for iron and steel production enterprises. In the iron ore processing plant, iron ore is processed into iron. The iron ore enters the plant and in the plant the iron ore is crushed, grinded, magnetic separated and gravity concentrated, etc, gradually the iron can be retrieved from natural minerals (iron ore). It is the mineral aggregates that contain iron or iron compounds which can be used economically.
Gameplay
Iron ore from the iron mine must be provided to the iron ore processing plant via a conveyor connection. The output is also a conveyor connectioniron via which the iron can be retrieved. The building must be equiopped with workers and electricity to function. Iron can be transported from the plant by dumper trucks, conveyors or aggregate storage cableways. Iron can be further processed in a steel mill into steel.
Production
Iron is produced from iron ore in a iron ore processing plant at a rate of 225t iron ore for 105t iron.
Storage
Iron or and iron may be stored in both small and large aggregate storage buildings.
Transportation
They can be transported by using dumper trucks or by trains using hopper cargo wagons.
Construction
Expansion required
This article is too short to provide more than rudimentary information about the subject and/or has missing construction stages. You can help us by expanding it.
|
Requirements | Groundworks | |||
---|---|---|---|---|
4122 52t 65t 200t 360t 4.2t | 978 52t 84t 65t Mechanisms: Excavators (max. 3) Needs workers (max. 412) |