Footpaths
Content review required
This article has been deemed to require a review of it's content.
|
Background
A footpath (also pedestrian way, walking trail, nature trail) is a type of thoroughfare that is intended for use only by pedestrians and not other forms of traffic such as motorized vehicles, bicycles and horses. They can be found in a wide variety of places, from the centre of cities, to farmland, to mountain ridges.
Gameplay
In Workers & Resources: Soviet Republic footpaths are mainly used by Citizens, they are really keen on using footpaths. Footpaths can be used to take shortcuts where the player can't put roads. Emergency vehicles like (secret) police cars, ambulances, fire trucks can also make use of footpaths but they prefer roads.
Footpaths can be connected to other footpaths and to roads. It's also possible to make use of overpasses and underpasses, which are only accessible by citizens. Metro related infrastructure can be found under underpasses.
Types
There are two kind of footpaths: mud and gravel. It's possible to upgrade mud footpaths to (gravel) footpaths.
Type | Cost | Walking speed | Max. speed (cars) | Notes |
---|---|---|---|---|
Mud |
Free Usage depends on length. |
50%[1] | 15 km/h | |
Footpath |
Workdays, Gravel Usage depends on length. |
87%[1] | 35 km/h | |
Asphalt footpath[2] |
Workdays, Gravel, Asphalt |
95% | 35 km/h | |
Asphalt footpath with lights[2] |
Workdays, Gravel, Asphalt, steel, |
100% | 35 km/h |
Notes
- Citizens walk a distance of 235m over mud paths, about 411m over gravel paths, about 450m over asphalt paths and about 479m over asphalt paths with lighting.
Overpass
Type | Cost | Walking speed | Notes |
---|---|---|---|
Pedestrian overpass steel |
Workdays, 1.9t Concrete 1.5t |
||
Pedestrian bridge (steel) |
Workdays, Concrete |
||
Pedestrian overpass concrete |
Workdays, 1.8t Concrete Gravel, 10t Prefab panels |
||
Pedestrian bridge (concrete) |
Workdays, Prefab panels Usage depends on length and height. |
Underpass
Type | Cost | Walking speed | Notes |
---|---|---|---|
Pedestrian underpass |
Workdays, 5.6t Concrete 4.3t |
||
Pedestrian metro entrance (stairs) |
Workdays, 33t Bricks 11t |
[3] | |
Pedestrian metro entrance (escalators) |
Workdays, 87t Concrete 2.6t |
[3] | |
Pedestrian tunnel |
Workdays, Bricks |
- ↑ 1.0 1.1 Walking speed updated to Workers & resources: Soviet Republic patch 0.8.9
- ↑ 2.0 2.1 Available from Workers & resources: Soviet Republic patch 0.8.9
- ↑ 3.0 3.1 Metro available from Workers & resources: Soviet Republic patch 0.8.8