Sewage

From Workers & Resources: Soviet Republic Official Wiki
(Redirected from Sewage treatment)
Cheat sheet how to connect sewage related items in game.
Cheat sheet how to connect sewage related items in game.

Water and Sewage are optional features and are only available when Water Management is enabled in game settings.

Background

Sewerage refers to the infrastructure that conveys sewage. It encompasses components such as receiving drains, manholes, pumping stations, storm overflows, and screening chambers of the sanitary sewer. Sewerage ends at the entry to a sewage treatment plant or at the point of discharge into the environment. In loose American English usage, the terms "sewerage" and "sewage" are sometimes used interchangeably.

Gameplay

When Water management is enabled in the game settings, the players republic will begin to generate wastewater. Wastewater must be collected and disposed of. The disposal of wastewater is possible by dumping it in a river or lake or by exporting it to a customs house at a certain fee.

General

Wastewater disposal

wastewater can be dumped in a river or lake with help of a sewage discharge. The sewage discharge has three input connections to connect with sewage pipes of any size. Another option to dispose the wastewater is by exporting the wastewater to a customs house. At the customs house the player has to pay a fee for exporting.

Wastewater quality

The quality of the wastewater is under influence of the building where the wastewater is being produced. The lower the '% Sewage pollution', the less polluted the wastewater is.

Before the player disposes the wastewater into a river or lake, the player has the ability to treat the wastewater in a sewage treatment plant and turn it over into polluted water. The player can control the quality of the water in the sewage treatment plant. In this plant the wastewater is treated with chemicals to become water which is polluted, with a maximum water quality of 85%.

Distribution

Wastewater must be collected throughout the republic for buildings to function. This can be done through small, medium, big sewage pipes or with a sewage truck. Big sewage pipes can transport more wastewater over longer distances. Medium sewage pipes can transport less wastewater. And small sewage pipes transport the least wastewater over distance. The player can join sewage pipes using sewage switches. Contrary to the name, sewage switches cannot switch on or off wastewater, and are only an interconnection between sewage pipes.

When using a sewage truck the player must use a sewage loading/unloading station to handle wastewater and the sewage truck must be stationed at the technical services building. The sewage loading/unloading station has multiple water connections for pipes of any size.

Wastewater can be collected from buildings by using a sewage tank. You can connect one sewage pipe to a sewage tank of any size. How far away a sewage tank can be placed from a building depends of the terrain height in the environment. If the sewage tank is at an lower height than the building, the distance increases. The larger the difference in height between sewage tank and building the more the distance is increased.

With help of a sewage pump the player can pump wastewater from a lower height to a higher height.

Each worker produces a little under 1 m^3 of sewage per day.

How to connect sewage

In the image below is displayed an example how the player can interconnect sewage related buildings. This is not an complete overview, but only showing how things can be connected. It's all up to the player's fantasy en need how to connect everything up to get a proper working sewer system.

Cheat sheet how to connect sewage related items in game. Example how to connect sewage related items in game.


The sewage pumps are optional and the placement of sewage pumps is related to the terrain height in the world. The player places sewage pumps to pump sewer over a hill. When the player daisy chains sewage pumps, very high heights can be overcome, but this comes with high costs.

Notes

  • Normal wastewater dynamics work, meaning gravity disposal sewage works, so the wastewater flows downhill, not uphill.
  • The sewage pipes in the game require a proper slope due to normal wastewater dynamics.

Buildings related to sewage

Sewage treatment

A sewage treatment plant is a destination where wastewater (water which is no longer fit for its current purpose) moves to once it leaves buildings. The wastewater flows to the treatment plant for processing through sewage pipes or delivered with a sewage truck. Ultraviolet lamps are used, they emit UV light which destroys the DNA of bacteria and, apart from that, chemicals such as chlorine are used to destroy microorganisms.

Name Cost Workers Production Consumption Energy Wattage Storage Structure Notes
Tool sewage treatment small.png
Sewage treatment small
See below Workers.png 10 Wastewater 80m3 Wastewater
Water 165m3 Water
Chemicals 0.32t Chemicals 11 MWh 189 kW 25m3 Wastewater Wastewater(import)
25m3 Wastewater Wastewater(export)
4.5t Chemicals Chemicals
Access 1x road access
2x sewage pipes
The desired water quality, after treatment, can be configured from the sewage treatment plant. The default and maximum setting is 85%, this means that water leaving the Water treatment plant is still polluted.

When there are no workers at the sewage treatment plant, the plant stops processing Wastewater, wastewater collects in the sewage pipes, they clog and the citizens can get sick.

L/U 2
Tool water treatment big.png
Sewage treatment big
See below Workers.png 20 Wastewater 220m3 Wastewater
Water 440m3 Water
Chemicals 0.60t Chemicals 15 MWh 264 kW 50m3 Wastewater Wastewater(import)
50m3 Wastewater Wastewater(export)
6.0t Chemicals Chemicals
Access 1x road access
4x sewage pipes(import)
6x sewage pipes(export)
See Water treatment small.
L/U 3

Sewage discharge

Name Cost Workers Energy Wattage Storage Structure Notes
Tool sewage discharge.png
Sewage discharge
Workdays 287 Workdays, Concrete 4.8t Concrete,
Gravel 3.7t Gravel, Asphalt 3.0t Asphalt,
Steel 4.2t Steel, Bricks 13t Bricks,
Boards 4.5t Boards, Mechanical components 0.54t Mechanical components
None 6,9 MWh 114 kW 10m3 Wastewater Wastewater(import) Access 1x footpath access
3x sewage pipes(input)
Sewage discharge is a structure that disposes wastewater quickly. It dumps sewage in a river or lake without requiring any type of treatment. The sewage discharge needs to be built partially on water and partially on soil.
L/U None

Sewage loading/unloading station

Name Cost Workers Energy Wattage Storage Structure Notes
Tool sewage filling station.png
Sewage loading/unloading station
Workdays 376 Workdays, Concrete 8.6t Concrete,

Gravel 6.6t Gravel, Bricks 10t Bricks,
Boards 3.4t Boards, Steel 6.7t Steel Mechanical components 1.1t Mechanical components

None 7,45 MWh 124 kW None Access 1x road access
2x sewage pipes(import)
2x sewage pipes(export)
Wastewater can be delivered or picked up from the sewage loading/unloading station with help of Sewage trucks.
L/U 2

Sewage pump

Name Cost Workers Energy/Wattage Storage Structure Notes
Tool sewage pump 1.png
Sewage pump -5m
Workdays 33 Workdays, Concrete 4.4t Concrete,

Gravel 0.12t Gravel, Steel 1.3t Steel,
Mechanical components 0.068t Mechanical components

None Depends on usage. 1.0m3 Wastewater Wastewater(import) Access 1x footpath access
1x sewage pipes(input)
1x sewage pipes(output)
With help of a sewage pump the player can pump Wastewater from a lower height to a higher height.
L/U None
Tool sewage pump 2.png
Sewage pump -10m
Workdays 48 Workdays, Concrete 6.6t Concrete,

Gravel 0.12t Gravel, Steel 2.0t Steel,
Mechanical components 0.10t Mechanical components

None Depends on usage. 1.0m3 Wastewater Wastewater(import) Access 1x footpath access
1x sewage pipes(input)
1x sewage pipes(output)
See Sewage pump -5m
L/U None
Tool sewage pump 3.png
Sewage pump -15m
Workdays 70 Workdays, Concrete 10t Concrete,

Gravel 0.13t Gravel, Steel 3.0t Steel,
Mechanical components 0.16t Mechanical components

None Depends on usage. 1.0m3 Wastewater Wastewater(import) Access 1x footpath access
1x sewage pipes(input)
1x sewage pipes(output)
See Sewage pump -5m
L/U None

Sewage switch

Name Cost Workers Energy Wattage Storage Structure Notes
Tool sewage switch.png
Sewage switch
Workdays 17 Workdays, Concrete 3.0t Concrete,

Gravel 0.19t Gravel, Steel 0.62t Steel

None 0 MWh 0 kW 1.0m3 Wastewater Wastewater(import) Access 1x footpath access
3x sewage pipes(input)
1x sewage pipes(output)
The player can join sewage pipes using a sewage switch. Contrary to the name, sewage switches cannot switch on or off Wastewater, and are only an interconnection between sewage pipes.
L/U None

Sewage tank

Name Cost Workers Energy Wattage Storage Structure Notes
Tool sewage substation.png
Sewage tank
Workdays 27 Workdays, Concrete 1.1t Concrete,

Gravel 0.82t Gravel, Asphalt 0.66t Asphalt,
Steel 0.30t Steel, Mechanical components 0.050t Mechanical components,
Bricks 0.48t Bricks, Boards 0.16t Boards

None 0 MWh 0 kW 12m3 Wastewater Wastewater(import) Access 1x footpath access
1x sewage pipes(output)
A sewage tank is placed for the local collection of Wastewater from the surrounding buildings. How far away a sewage tank can be placed from a building depends on the terrain height in the environment. A sewage tank needs to be placed at the same height as a building, but it's better to place the sewage tank at a lower height. The larger the difference in height between sewage tank and building the more the distance is increased. If the sewage tank is at a higher height than the building, the sewage tank will NOT collect Wastewater.
L/U None

Sewage pipes

Name Cost Throughput Notes
Sewage pipe small-toolbar.png
Sewage pipe small
Workdays Workdays, Concrete Concrete,

Gravel Gravel, Prefab panels Prefab panels,
Boards Boards
Usage depends on length and depth.

36,95m3
Sewage pipe medium-toolbar.png
Sewage pipe medium
Workdays Workdays, Concrete Concrete,

Gravel Gravel, Prefab panels Prefab panels,
Boards Boards
Usage depends on length and depth.

75,40m3
Sewage pipe big-toolbar.png
Sewage pipe big
Workdays Workdays, Concrete Concrete,

Gravel Gravel, Prefab panels Prefab panels,
Boards Boards
Usage depends on length and depth.

169,65m3

Construction

Sewage treatment small
Requirements
Workdays 1431 Workdays
Asphalt 26t Asphalt
Bricks 12t Bricks
Boards 4.2t Boards
Gravel 32t Gravel
Steel 32t Steel
Sewage treatment big
Requirements
Workdays 3154 Workdays
Asphalt 51t Asphalt
Bricks 33t Bricks
Boards 11t Boards
Concrete 202t Concrete
Gravel 63t Gravel
Steel 75t Steel

Gallery