Sawmill: Difference between revisions

From Workers & Resources: Soviet Republic Official Wiki
workers-resources-fandom>AboBot
m (→‎top: Infobox alteration, replaced: {{Building → {{Infobox building)
 
m (1 revision imported)
 
(No difference)

Latest revision as of 18:24, 14 June 2024

Sawmills process Wood into Boards. A Woodcutting Post at maximum production produces 189 tons of wood per day (30 Workers * 6.3t wood) and a sawmill at maximum production consumes 180t wood per workday, so each sawmill should have its own dedicated woodcutting post. At maximum production, a sawmill will consume 180t wood to make 140t boards per day; a ratio of 9 : 7. Boards are an important Construction material.